765 kV Lines

While HB 5066 authorized a limited fix for local electric transmission in the Permian Basin, the 765 kV Strategic Transmission Expansion Program (STEP) authorized by ERCOT is being planned without the express authorization of the Texas Legislature. They are being built by bought-out bureaucrats in Austin with little to no oversight from the people or their elected representatives. The 765 KV STEP lines are for the data center takeover of Texas.

Not only that, they are being built in an irresponsible way. Some are crossing gas pipelines without the proper planning for AC mitigation systems, which will cause ecological disasters in the future. They are taking ranchland, farmland, dairies, harming property values, harming soil, harming health, and more. The consequences could lead to many farms and ranches losing revenue as landowners are forced to defend their lands from the land grab. The total acreage lost statewide to the 765  KV STEP  is estimated at 70,000 acres, with 8 to 10 billion lost in property values on the low end. Additionally, every Texan can expect a rate increase in electricity bills regardless of promises that Texans shouldn't be responsible for paying for data centers to connect to the grid. 

The 765 lines are not for the people. It's for the data center takeover of Texas. 

In addition, we should start burying many current and future transmission lines and reconsider how we plan for both transmission and generation for the ERCOT grid.

Buried lines are better than above-ground transmission lines due to:

  • Above-ground lines are extremely susceptible to weather, constantly needing repair. This will be less of a problem when they're buried. 
  • Above-ground lines can release PFAFs/PFOAs/forever chems into soil, harming our soil, farms, and food in some situations. Buried ones don't.
  • Above-ground lines can release electromagnetic radiation, while buried ones can be shielded. 
  • Above-ground lines harm property values. Buried ones won't.
  • Above-ground lines scar Texas. Buried ones don't. 

Better transmission and generation planning should involve the landowners during the planning process instead of hiding projects from the public. The lack of transparency for grid planning is alarming. 

We must stop the 765 kV transmission lines. No new lines until the Texas Legislature expressly approves them and better grid planning practices are implemented.  If any are approved, they should not take or harm private property or persons. Furthermore, many  current or future transmission lines, where feasible, should be buried. 

Who's signing
Stephani Forcado
Eric Cederstrom
Lynn Sims
Lyn Pool
Nick G
David Pedersen
Tamra Jolly
Esteban Guadarrama
Dave Clark
Wendy Fischer
Nichole House
Susan Lanford
Tess Ramirez
Ashlie B
Rachel Pruiett
Tera Montgomery
Nereida Garcia
Keena Miller
Gwendolyn Sellers
Jourden Blackburn
Philip Walker
Robyn Reviere
Or Parrack
Jeremy Louder
Brittany McQuaide
Katie Crowley
Marilyn Kelso
Teri Lum
Vanessa Halford
Audrey Douglass

Will you sign?

optional

By selecting the "Send me text message updates," you are agreeing to receive up to 0-4 text message(s) per month from the Clayton Tucker Campaign. The Clayton Tucker Campaign's mobile campaigns provide subscribers with updates, event invitations, donation asks, petition asks, endorsement asks, and voting reminders. Messages may include donation asks. Message and data rates may apply. Text HELP for more information. Text STOP to stop receiving messages. Terms and Privacy Policy.

or Text 765 to +12544556838 to sign

Showing 30 reactions

  • Stephani Forcado
    signed 2026-11-26 12:19:50 -0600
  • Eric Cederstrom
    signed 2026-11-26 07:18:16 -0600
  • Lynn Sims
    signed 2026-11-26 06:59:38 -0600
  • Lyn Pool
    signed 2026-11-26 06:26:15 -0600
  • Nick G
    signed 2026-11-26 00:55:09 -0600
  • David Pedersen
    signed 2026-11-26 00:25:22 -0600
  • Tamra Jolly
    signed 2026-11-25 22:11:39 -0600
    Clayton please stop this!
  • Esteban Guadarrama
    signed 2026-11-25 21:55:36 -0600
    Let’s bury our power lines!
  • Dave Clark
    signed 2026-11-25 20:38:28 -0600
  • Wendy Fischer
    signed 2026-11-25 20:28:39 -0600
  • Nichole House
    signed 2026-11-25 19:32:45 -0600
  • Susan Lanford
    signed 2026-11-25 18:58:55 -0600
  • Tess Ramirez
    signed 2026-11-22 21:27:57 -0600
  • Ashlie B
    signed 2026-11-19 19:33:18 -0600
  • Rachel Pruiett
    signed 2026-11-18 15:52:12 -0600
  • Tera Montgomery
    signed 2026-11-18 11:38:36 -0600
  • Nereida Garcia
    signed 2026-11-18 09:48:25 -0600
  • Keena Miller
    signed 2026-11-18 07:27:38 -0600
  • Gwendolyn Sellers
    signed 2026-11-17 22:56:21 -0600
  • Jourden Blackburn
    signed 2026-11-17 09:37:58 -0600
  • Philip Walker
    signed 2026-11-16 14:26:57 -0600
  • Robyn Reviere
    signed 2026-11-16 10:33:14 -0600
    Remove ERCOT and fix the grid, rejoin the main grid.
  • Or Parrack
    signed 2026-11-16 07:15:40 -0600
  • Jeremy Louder
    signed 2026-11-16 05:18:35 -0600
    Stop it
  • Brittany McQuaide
    signed 2026-11-16 00:11:43 -0600
  • Katie Crowley
    signed 2026-11-15 19:32:19 -0600
  • Marilyn Kelso
    signed 2026-11-15 16:39:00 -0600
  • Teri Lum
    signed 2026-11-15 09:46:42 -0600
    I’ve been advocating for buried HVDC power lines in EXISTING right of ways for months. now. HVDC is not new tech but has been used in Europe for decades with their own proven equipment. The Chinese are ALL IN on HVDC power transmission. In addition, HVDC has lower power losses over it’s lifetime compared to HVAC. With the probable collapse of the Ai bubble soon, any new power lines may become a moot point.
  • Vanessa Halford
    signed 2026-11-15 07:05:07 -0600
  • Audrey Douglass
    signed 2026-11-15 06:23:42 -0600

Help increase our impact!